Discover the investment opportunities in strategic public infrastructure projects in Chile.
View OpportunitiesDeadline: 10/07/2025
Investment: US $318 MM
The technical sheet contains:
The project involves the construction and operation of a seawater desalination plant located in the Panul sector, as well as its respective water conduction works for the Coquimbo Region, to supply drinking water for human consumption in the districts of Coquimbo and La Serena, with potential expansion to other systems.
Deadline: 13/06/2025
Investment: US $410 MM
The technical sheet contains:
The project is located in the San Fabián and Coihueco districts in the Punilla Province, Ñuble Region, and involves the development of a multipurpose reservoir with a useful volume of 540 hm3. The project will address irrigation needs and additionally contribute to the generation of hydroelectric power and water reserves for human consumption.
Deadline: 30/04/2025
Investment: US $594 MM
The technical sheet contains:
The work involves improvements to Route 5 in the province of Chiloé along an extension of 126 km and a route that crosses the districts of Ancud, Dalcahue, Castro and Chonchi. The project starts at the southern access to the future bridge over the Chacao Channel and ends at the fork in the northern access to Chonchi. It also considers operation and maintenance of approximately 16 kilometers of road with a bi-directional roadway profile, corresponding to the Castro Bypass.
Deadline: 22/08/2025
Investment: US $113 MM
The technical sheet contains:
The project consists of the construction and implementation of a warning and notification system for possible risks and tsunami evacuation processes based on a network of sound and visual alarm stations, including a redundant communication system and control centers on regional and central levels.
Deadline: 25/04/2025
Investment: US 804 MM
The technical sheet contains:
The project involves the expansion, improvement, maintenance, and operation of Route 5 in the section between the end of the Route 5 Vallenar - Caldera concession and the current Antofagasta Region Highways concession, covering approximately 466.2 km (290 miles).
Deadline: 31/07/2025
Investment: US 355 MM
The technical sheet contains:
The project involves the development of an alternative route to the current Route 160, between the municipalities of San Pedro de la Paz and Coronel, which has experienced significant growth in recent years.
The works will follow a path along the hillside, east of Route 160, connecting to the north with the Puente Industrial Road Concession, which is under construction, and to the south with the Route 160 Concession, Coronel - Tres Pinos Section.
Deadline: 27/05/2025
Investment: US 276 MM
The technical sheet contains:
The new facility will be located on state-owned land near Route 5 North, approximately 40 kilometers (25 miles) northwest of the city of Copiapó and 14 kilometers (9 miles) south of the Desierto de Atacama Airport, in the Atacama Region.
The architectural proposal includes a total area of approximately 76,600 m2, with an estimated capacity of 2,160 inmates, distributed across 15 detention modules.
Deadline: 26/06/2025
Investment: US 171 MM
The technical sheet contains:
The project involves the construction and maintenance of a centralized public transportation corridor between the connection with the Puente Industrial - Junquillar Link and San Francisco (Coronel).
Deadline: 27/06/2025
Investment: US 172 MM
The technical sheet contains:
The project involves the construction and maintenance of two public transportation corridors located in the center of the Concepción-Talcahuano Highway, Section II, and Route 150.
Deadline: To be determined
Investment: US 1.747 MM (Preliminary amount)
The technical sheet contains:
This project involves a new urban highway connecting the existing concession on Santiago’s northwestern access road with Route 78 and the future Orbital Sur concession to the city’s south. This highway would be the western portion of a new beltway around Santiago.
Deadline: To be determined
Investment: US 757 MM (Preliminary amount)
The technical sheet contains:
This concession opportunity consists of widening and improving Route 57 CH, which connects Santiago in the Metropolitan Region and Route 60, located east of the city of Los Andes in the Valparaíso Region.
The route is 108.7 km long and includes spurs to Auco-San Felipe (Route E-89 9), Chacabuco-Polpaico (Route G-71) and San José-Lo Pinto (Route G-73).
Deadline: To be determined
Investment: US 621 MM (Preliminary amount)
The technical sheet contains:
This project is a re-bidding of the 144 km section of the existing Route 5, which connects the cities of Collipulli and Temuco in Chile’s Araucanía Region. It involves improving, refurbishing and maintaining the existing two-lane highway as well as constructing third lanes in specific populated areas with higher safety and signage standards.
Deadline: To be determined
Investment: US 712 MM (Preliminary amount)
The technical sheet contains:
The project is for the widening, improvement, maintenance and operation of Routes 202 and 206 in the Los Ríos region. At 44.3 km and 43.1 km long, respectively, both are planned as two-lane highways with service speeds of 120 km/h and 100 km/h, with occasional 80 km/h areas.
The project includes replacing existing bridges and constructing new bridges, as well as pedestrian walkways, bus stops, and interchanges.
Deadline: To be determined
Investment: US 126 MM (Preliminary amount)
The technical sheet contains:
This project involves a cable car system spanning approximately 5.5 km to connect the Los Cóndores station in the Alto Hospicio district with Rotonda El Pampino in the city of Iquique.
Deadline: To be determined
Investment: US 587 MM (Preliminary amount)
The technical sheet contains:
This concession opportunity consists of widening the two-lane Route 5 highway between the cities of Antofagasta and Iquique from the Carmen Alto sector to the Iquique access road (Route 16) near Humberstone.
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
10/07/2025
US $318 MM
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
13/06/2025
US $410 MM
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
30/04/2025
US $594 MM
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
22/08/2025
US $113 MM
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
25/04/2025
US 804 MM
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
31/07/2025
US 355 MM
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
27/05/2025
US 276 MM
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
26/06/2025
US 171 MM
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
27/06/2025
US 172 MM
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
To be determined
US 1.747 MM (Preliminary amount)
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
To be determined
US 757 MM (Preliminary amount)
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
To be determined
US 621 MM (Preliminary amount)
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
To be determined
US 712 MM (Preliminary amount)
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
To be determined
US 126 MM (Preliminary amount)
Find out more about the project details, its main works, and schedule. Get more information on the financial and environmental management conditions.
To be determined
US 587 MM (Preliminary amount)