Investment Opportunities in Infrastructure

Opportunities

Penitentiary Facilities Current Tender

Calama Penitentiary Center Concession

Antofagasta

Deadline: 24/11/2026

Investment: USD 344 M

Download Terms
The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Calama Penitentiary Center Concession This concession includes facility maintenance and upkeep, the provision of prison services and the construction of an Education and Work Center for people deprived of liberty, specialized modules for people with disabilities, an addiction treatment center, a helicopter pad, administrative offices for wardens and security infrastructure, like access controls, perimeter walls, watchtowers, CCTV systems, etc.
Transport Current Tender

Alto Hospicio Cable Car - Iquique

Tarapacá

Deadline: 30/07/2026

Investment: USD 129 M (preliminary)

Download Terms
The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Alto Hospicio Cable Car - Iquique This project involves a cable car system spanning approximately 5.7 km to connect the Esmeralda station in the Alto Hospicio district with Rotonda El Pampino in the city of Iquique.
Public Buildings Upcoming Tender

Southern Airport Network: El Tepual (5a), Cañal Bajo, Mocopulli, and Pichoy

Los Lagos / Los Ríos

Deadline: To be determined

Investment: USD 240 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Southern Airport Network: El Tepual (5a), Cañal Bajo, Mocopulli, and Pichoy This project includes the fifth concession of El Tepual Airport in Puerto Montt and the incorporation into the concessions system of Cañal Bajo Airport in Osorno and Mocopulli Airport in Chiloé.
Penitentiary Facilities Upcoming Tender

High-Security Prison Concession - Santiago 1

Metropolitana

Deadline: To be determined

Investment: USD 188 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
High-Security Prison Concession - Santiago 1 This project involves expanding the existing prison, which has a capacity for 4,000 inmates, to hold an additional 600 inmates. The concession includes facility maintenance and upkeep as well as the construction of new infrastructure, including three high-security modules and one maximum-security module, a new prison health unit and new administrative areas for the wardens.
Road Current Tender

Valdivia Access Roads

Los Ríos

Deadline: 10/09/2026

Investment: USD 587 M (preliminary)

Download Terms
The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Valdivia Access Roads The project is for the widening, improvement, maintenance and operation of Routes 202 and 206 in the Los Ríos region. At 44.3 km and 43.1 km long, respectively, both are planned as two-lane highways with service speeds of 120 km/h and 100 km/h, with occasional 80 km/h areas. The project includes replacing existing bridges and constructing new bridges, as well as pedestrian walkways, bus stops, and interchanges.
Public Buildings Closed Tender

National Tsunami Early Warning System

Territorio Nacional

Deadline: In the contract awarding phase

Investment: USD 115 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
National Tsunami Early Warning System The project consists of the construction and implementation of a warning and notification system for possible risks and tsunami evacuation processes based on a network of sound and visual alarm stations, including a redundant communication system and control centers on regional and central levels.
Road Closed Tender

Route 5 Concession Caldera - Antofagasta Section

Antofagasta / Atacama

Deadline: Revoked – Res. Ex. DGC N°203 del 21/01/2026

Investment:

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Route 5 Concession Caldera - Antofagasta Section The project involves the expansion, improvement, maintenance, and operation of Route 5 in the section between the end of the Route 5 Vallenar - Caldera concession and the current Antofagasta Region Highways concession, covering approximately 466.2 km (290 miles).
Road Closed Tender

Public Transportation Corridor Route 160

Biobío

Deadline: In the contract awarding phase

Investment: USD 171 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Public Transportation Corridor Route 160 The project involves the construction and maintenance of a centralized public transportation corridor between the connection with the Puente Industrial - Junquillar Link and San Francisco (Coronel).
Road Closed Tender

Public Transportation Corridor Route 150

Biobío

Deadline: In the contract awarding phase

Investment: USD 172 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Public Transportation Corridor Route 150 The project involves the construction and maintenance of two public transportation corridors located in the center of the Concepción-Talcahuano Highway, Section II, and Route 150.
Road Upcoming Tender

Orbital Norponiente Highway in Santiago

Metropolitana

Deadline: To be determined

Investment: USD 1,782 M (preliminary)

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Orbital Norponiente Highway in Santiago This project involves a new urban highway connecting the existing concession on Santiago’s northwestern access road with Route 78 and the future Orbital Sur concession to the city’s south. This highway would be the western portion of a new beltway around Santiago.
Road Current Tender

The second concession for Route 57 Santiago-Colina-Los Andes

Valparaíso / Metropolitana

Deadline: 21/07/2026

Investment: USD 946 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
The second concession for Route 57 Santiago-Colina-Los Andes This concession opportunity consists of widening and improving Route 57 CH, which connects Santiago in the Metropolitan Region and Route 60, located east of the city of Los Andes in the Valparaíso Region. The route is 108.7 km long and includes spurs to Auco-San Felipe (Route E-89 9), Chacabuco-Polpaico (Route G-71) and San José-Lo Pinto (Route G-73).
Road Current Tender

The second concession for Route 5 between Collipulli and Temuco

Araucanía

Deadline: 11/08/2026

Investment: USD 1,051 M

Download Terms
The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
The second concession for Route 5 between Collipulli and Temuco This project is a re-bidding of the 144 km section of the existing Route 5, which connects the cities of Collipulli and Temuco in Chile’s Araucanía Region. It involves improving, refurbishing and maintaining the existing two-lane highway as well as constructing third lanes in specific populated areas with higher safety and signage standards.
Road Upcoming Tender

Route 5 between Iquique and Antofagasta

Tarapacá / Antofagasta

Deadline: To be determined

Investment: USD 614 M (preliminary)

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Route 5 between Iquique and Antofagasta This concession opportunity consists of widening the two-lane Route 5 highway between the cities of Antofagasta and Iquique from the Carmen Alto sector to the Iquique access road (Route 16) near Humberstone.
Transport Upcoming Tender

Talcahuano Cable Car

Biobío

Deadline: To be determined

Investment: USD 135 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Talcahuano Cable Car The proposal involves the development of two lines. The first will connect downtown Talcahuano with the Mirador del Pacífico area, with stops at Cerro Cornou and the Antenas and Centinela II sectors, and five stations across a 1.8-mile route. The second line will transport passengers from the Antenas station on line 1 to the Los Lobos area, with a 0.8-mile route.
Transport Upcoming Tender

Valparaíso - Santiago Railway Concession

Valparaíso / Metropolitana

Deadline: To be determined

Investment: USD 1,320 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Valparaíso - Santiago Railway Concession This project aims to recover and promote rail connectivity between Valparaíso and Santiago by gradually developing a railway and connecting districts with poor accessibility —e.g., Tiltil, La Calera and Llay Llay—with the regional capitals. The concession will favor existing rail infrastructure and complement the rail network with a high standard and level of service.
Road Upcoming Tender

Route G21 Second concession - Road to Farellones

Metropolitana

Deadline: To be determined

Investment: USD 150 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Route G21 Second concession - Road to Farellones The project, involving 31.4 km of roadway in the Metropolitan Region’s Las Condes and Lo Barnechea districts, consists mainly of improving Route G-21 between Av. Las Condes and the intersection with Route G-251 to Valle Nevado in Farellones and 1.1 kilometers of the access road to Los Bronces mine (Route G-245).
Public Buildings Upcoming Tender

Second Santiago Justice Center concession

Metropolitana

Deadline: To be determined

Investment: USD 199 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Second Santiago Justice Center concession This project consists of expanding, repairing, maintaining, and operating this public facility, providing better service conditions for the public and personnel working at the site.
Public Buildings Upcoming Tender

Second O'Higgins Park covered stadium concession

Metropolitana

Deadline: To be determined

Investment: USD 79 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Second O'Higgins Park covered stadium concession This project is a re-tender of the covered stadium at Parque O’Higgins, including improvements and the operation of a venue for 12,000 spectators, suitable for hosting artistic and sporting events, among others.
Road Closed Tender

Second Route 5 concession, Río Bueno – Puerto Montt section

Los Ríos / Los Lagos

Deadline: In the contract awarding phase

Investment: USD 821 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Second Route 5 concession, Río Bueno – Puerto Montt section New works are planned such as third lanes in some areas, new interchanges and improvements to existing ones, new U-turns and crossings, replacement of bridges that have reached the end of their lifespan, geometric rectifications to the highway, new service roads and bike lanes, replacement and addition of pedestrian bridges with their corresponding stops and walking routes, lighting, and road safety improvements including the replacement of all safety barriers to meet current standards, among others.
Road Closed Tender

Route 5 Chacao-Chonchi Concession

Los Lagos

Deadline: Awarded

Investment: USD 594 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Route 5 Chacao-Chonchi Concession The work involves improvements to Route 5 in the province of Chiloé along an extension of 126 km and a route that crosses the districts of Ancud, Dalcahue, Castro and Chonchi. The project starts at the southern access to the future bridge over the Chacao Channel and ends at the fork in the northern access to Chonchi. It also considers operation and maintenance of approximately 16 kilometers of road with a bi-directional roadway profile, corresponding to the Castro Bypass.
Road Closed Tender

Pie de Monte Route Concession

Biobío

Deadline: In the contract awarding phase

Investment: USD 355 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Pie de Monte Route Concession The project involves the development of an alternative route to the current Route 160, between the municipalities of San Pedro de la Paz and Coronel, which has experienced significant growth in recent years. The works will follow a path along the hillside, east of Route 160, connecting to the north with the Puente Industrial Road Concession, which is under construction, and to the south with the Route 160 Concession, Coronel - Tres Pinos Section.
Public Buildings Closed Tender

Coquimbo Desalination Plant

Coquimbo

Deadline: In the contract awarding phase

Investment: USD 318 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Coquimbo Desalination Plant The project involves the construction and operation of a seawater desalination plant located in the Panul sector, as well as its respective water conduction works for the Coquimbo Region, to supply drinking water for human consumption in the districts of Coquimbo and La Serena, with potential expansion to other systems.
Penitentiary Facilities Closed Tender

New Penitentiary Facility in Copiapó

Atacama

Deadline: Awarded

Investment: USD 276 M

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
New Penitentiary Facility in Copiapó The new facility will be located on state-owned land near Route 5 North, approximately 40 kilometers (25 miles) northwest of the city of Copiapó and 14 kilometers (9 miles) south of the Desierto de Atacama Airport, in the Atacama Region. The architectural proposal includes a total area of approximately 76,600 m2, with an estimated capacity of 2,160 inmates, distributed across 15 detention modules.
Penitentiary Facilities Upcoming Tender

2nd Concession Penitentiary Infrastructure Group 1 (Alto Hospicio – La Serena)

Tarapacá / Coquimbo

Deadline: Q2 2027

Investment: USD 297 M (preliminary)

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
2nd Concession Penitentiary Infrastructure Group 1 (Alto Hospicio – La Serena) The project of the Second Concession includes, in principle, the expansion and operation of 1,659 new places, distributed as 843 for Alto Hospicio and 816 for La Serena, in more than 49,000 additional m2 and with an approximate investment of USD 297 million.
Penitentiary Facilities Upcoming Tender

Second Concession for the Rancagua Penitentiary Facility

O'Higgins

Deadline: Q2 2027

Investment: USD 140 M (preliminary)

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
Second Concession for the Rancagua Penitentiary Facility The project of the second concession includes, in principle, the expansion and operation of 900 new places in more than 24,000 additional m2 and with an approximate investment of US$ 140 million.
Penitentiary Facilities Upcoming Tender

2nd Concession Penitentiary Infrastructure Group 3 (Valdivia and Puerto Montt)

Los Ríos / Los Lagos

Deadline: Q1 2027

Investment: USD 200 M (preliminary)

The technical sheet contains:
  • Principales obras del proyecto
  • Tratamiento ambiental y condiciones económicas
  • Cronograma general y plazos contractuales
2nd Concession Penitentiary Infrastructure Group 3 (Valdivia and Puerto Montt) The Project includes, in principle, the expansion and operation of 900 new places, distributed as 300 for Valdivia and 600 for Puerto Montt, in more than 26,000 additional m2 and with an approximate investment of US$ 200 million.

No projects found

Try changing the selected combination of filters.

Filters

Download Bidding Terms

Patricio Álvarez V.

Patricio Álvarez V.

Investments Sector Leader

Public Tenders and Logistics
InvestChile

I'm ready to assist you and answer any queries you may have.

Get in touch