Opportunities
Projects
Calama Penitentiary Center Concession
Antofagasta
Deadline: 24/11/2026
Investment: USD 344 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This concession includes facility maintenance and upkeep, the provision of prison services and the construction of an Education and Work Center for people deprived of liberty, specialized modules for people with disabilities, an addiction treatment center, a helicopter pad, administrative offices for wardens and security infrastructure, like access controls, perimeter walls, watchtowers, CCTV systems, etc.
Alto Hospicio Cable Car - Iquique
Tarapacá
Deadline: 30/07/2026
Investment: USD 129 M (preliminary)
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This project involves a cable car system spanning approximately 5.7 km to connect the Esmeralda station in the Alto Hospicio district with Rotonda El Pampino in the city of Iquique.
Southern Airport Network: El Tepual (5a), Cañal Bajo, Mocopulli, and Pichoy
Los Lagos / Los Ríos
Deadline: To be determined
Investment: USD 240 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This project includes the fifth concession of El Tepual Airport in Puerto Montt and the incorporation into the concessions system of Cañal Bajo Airport in Osorno and Mocopulli Airport in Chiloé.
High-Security Prison Concession - Santiago 1
Metropolitana
Deadline: To be determined
Investment: USD 188 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This project involves expanding the existing prison, which has a capacity for 4,000 inmates, to hold an additional 600 inmates.
The concession includes facility maintenance and upkeep as well as the construction of new infrastructure, including three high-security modules and one maximum-security module, a new prison health unit and new administrative areas for the wardens.
Valdivia Access Roads
Los Ríos
Deadline: 10/09/2026
Investment: USD 587 M (preliminary)
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The project is for the widening, improvement, maintenance and operation of Routes 202 and 206 in the Los Ríos region. At 44.3 km and 43.1 km long, respectively, both are planned as two-lane highways with service speeds of 120 km/h and 100 km/h, with occasional 80 km/h areas.
The project includes replacing existing bridges and constructing new bridges, as well as pedestrian walkways, bus stops, and interchanges.
National Tsunami Early Warning System
Territorio Nacional
Deadline: In the contract awarding phase
Investment: USD 115 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The project consists of the construction and implementation of a warning and notification system for possible risks and tsunami evacuation processes based on a network of sound and visual alarm stations, including a redundant communication system and control centers on regional and central levels.
Route 5 Concession Caldera - Antofagasta Section
Antofagasta / Atacama
Deadline: Revoked – Res. Ex. DGC N°203 del 21/01/2026
Investment: —
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The project involves the expansion, improvement, maintenance, and operation of Route 5 in the section between the end of the Route 5 Vallenar - Caldera concession and the current Antofagasta Region Highways concession, covering approximately 466.2 km (290 miles).
Public Transportation Corridor Route 160
Biobío
Deadline: In the contract awarding phase
Investment: USD 171 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The project involves the construction and maintenance of a centralized public transportation corridor between the connection with the Puente Industrial - Junquillar Link and San Francisco (Coronel).
Public Transportation Corridor Route 150
Biobío
Deadline: In the contract awarding phase
Investment: USD 172 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The project involves the construction and maintenance of two public transportation corridors located in the center of the Concepción-Talcahuano Highway, Section II, and Route 150.
Orbital Norponiente Highway in Santiago
Metropolitana
Deadline: To be determined
Investment: USD 1,782 M (preliminary)
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This project involves a new urban highway connecting the existing concession on Santiago’s northwestern access road with Route 78 and the future Orbital Sur concession to the city’s south. This highway would be the western portion of a new beltway around Santiago.
The second concession for Route 57 Santiago-Colina-Los Andes
Valparaíso / Metropolitana
Deadline: 21/07/2026
Investment: USD 946 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This concession opportunity consists of widening and improving Route 57 CH, which connects Santiago in the Metropolitan Region and Route 60, located east of the city of Los Andes in the Valparaíso Region.
The route is 108.7 km long and includes spurs to Auco-San Felipe (Route E-89 9), Chacabuco-Polpaico (Route G-71) and San José-Lo Pinto (Route G-73).
The second concession for Route 5 between Collipulli and Temuco
Araucanía
Deadline: 11/08/2026
Investment: USD 1,051 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This project is a re-bidding of the 144 km section of the existing Route 5, which connects the cities of Collipulli and Temuco in Chile’s Araucanía Region. It involves improving, refurbishing and maintaining the existing two-lane highway as well as constructing third lanes in specific populated areas with higher safety and signage standards.
Route 5 between Iquique and Antofagasta
Tarapacá / Antofagasta
Deadline: To be determined
Investment: USD 614 M (preliminary)
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This concession opportunity consists of widening the two-lane Route 5 highway between the cities of Antofagasta and Iquique from the Carmen Alto sector to the Iquique access road (Route 16) near Humberstone.
Talcahuano Cable Car
Biobío
Deadline: To be determined
Investment: USD 135 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The proposal involves the development of two lines. The first will connect downtown Talcahuano with the Mirador del Pacífico area, with stops at Cerro Cornou and the Antenas and Centinela II sectors, and five stations across a 1.8-mile route. The second line will transport passengers from the Antenas station on line 1 to the Los Lobos area, with a 0.8-mile route.
Valparaíso - Santiago Railway Concession
Valparaíso / Metropolitana
Deadline: To be determined
Investment: USD 1,320 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This project aims to recover and promote rail connectivity between Valparaíso and Santiago by gradually developing a railway and connecting districts with poor accessibility —e.g., Tiltil, La Calera and Llay Llay—with the regional capitals. The concession will favor existing rail infrastructure and complement the rail network with a high standard and level of service.
Route G21 Second concession - Road to Farellones
Metropolitana
Deadline: To be determined
Investment: USD 150 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The project, involving 31.4 km of roadway in the Metropolitan Region’s Las Condes and Lo Barnechea districts, consists mainly of improving Route G-21 between Av. Las Condes and the intersection with Route G-251 to Valle Nevado in Farellones and 1.1 kilometers of the access road to Los Bronces mine (Route G-245).
Second Santiago Justice Center concession
Metropolitana
Deadline: To be determined
Investment: USD 199 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This project consists of expanding, repairing, maintaining, and operating this public facility, providing better service conditions for the public and personnel working at the site.
Second O'Higgins Park covered stadium concession
Metropolitana
Deadline: To be determined
Investment: USD 79 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
This project is a re-tender of the covered stadium at Parque O’Higgins, including improvements and the operation of a venue for 12,000 spectators, suitable for hosting artistic and sporting events, among others.
Second Route 5 concession, Río Bueno – Puerto Montt section
Los Ríos / Los Lagos
Deadline: In the contract awarding phase
Investment: USD 821 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
New works are planned such as third lanes in some areas, new interchanges and improvements to existing ones, new U-turns and crossings, replacement of bridges that have reached the end of their lifespan, geometric rectifications to the highway, new service roads and bike lanes, replacement and addition of pedestrian bridges with their corresponding stops and walking routes, lighting, and road safety improvements including the replacement of all safety barriers to meet current standards, among others.
Route 5 Chacao-Chonchi Concession
Los Lagos
Deadline: Awarded
Investment: USD 594 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The work involves improvements to Route 5 in the province of Chiloé along an extension of 126 km and a route that crosses the districts of Ancud, Dalcahue, Castro and Chonchi. The project starts at the southern access to the future bridge over the Chacao Channel and ends at the fork in the northern access to Chonchi. It also considers operation and maintenance of approximately 16 kilometers of road with a bi-directional roadway profile, corresponding to the Castro Bypass.
Pie de Monte Route Concession
Biobío
Deadline: In the contract awarding phase
Investment: USD 355 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The project involves the development of an alternative route to the current Route 160, between the municipalities of San Pedro de la Paz and Coronel, which has experienced significant growth in recent years.
The works will follow a path along the hillside, east of Route 160, connecting to the north with the Puente Industrial Road Concession, which is under construction, and to the south with the Route 160 Concession, Coronel - Tres Pinos Section.
Coquimbo Desalination Plant
Coquimbo
Deadline: In the contract awarding phase
Investment: USD 318 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The project involves the construction and operation of a seawater desalination plant located in the Panul sector, as well as its respective water conduction works for the Coquimbo Region, to supply drinking water for human consumption in the districts of Coquimbo and La Serena, with potential expansion to other systems.
New Penitentiary Facility in Copiapó
Atacama
Deadline: Awarded
Investment: USD 276 M
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The new facility will be located on state-owned land near Route 5 North, approximately 40 kilometers (25 miles) northwest of the city of Copiapó and 14 kilometers (9 miles) south of the Desierto de Atacama Airport, in the Atacama Region.
The architectural proposal includes a total area of approximately 76,600 m2, with an estimated capacity of 2,160 inmates, distributed across 15 detention modules.
2nd Concession Penitentiary Infrastructure Group 1 (Alto Hospicio – La Serena)
Tarapacá / Coquimbo
Deadline: Q2 2027
Investment: USD 297 M (preliminary)
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The project of the Second Concession includes, in principle, the expansion and operation of 1,659 new places, distributed as 843 for Alto Hospicio and 816 for La Serena, in more than 49,000 additional m2 and with an approximate investment of USD 297 million.
Second Concession for the Rancagua Penitentiary Facility
O'Higgins
Deadline: Q2 2027
Investment: USD 140 M (preliminary)
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The project of the second concession includes, in principle, the expansion and operation of 900 new places in more than 24,000 additional m2 and with an approximate investment of US$ 140 million.
2nd Concession Penitentiary Infrastructure Group 3 (Valdivia and Puerto Montt)
Los Ríos / Los Lagos
Deadline: Q1 2027
Investment: USD 200 M (preliminary)
- Principales obras del proyecto
- Tratamiento ambiental y condiciones económicas
- Cronograma general y plazos contractuales
The Project includes, in principle, the expansion and operation of 900 new places, distributed as 300 for Valdivia and 600 for Puerto Montt, in more than 26,000 additional m2 and with an approximate investment of US$ 200 million.
No projects found
Try changing the selected combination of filters.
Filters
Download Bidding Terms
Calama Penitentiary Center Concession
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Alto Hospicio Cable Car - Iquique
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Southern Airport Network: El Tepual (5a), Cañal Bajo, Mocopulli, and Pichoy
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
High-Security Prison Concession - Santiago 1
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Valdivia Access Roads
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
National Tsunami Early Warning System
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Route 5 Concession Caldera - Antofagasta Section
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Public Transportation Corridor Route 160
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Public Transportation Corridor Route 150
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Orbital Norponiente Highway in Santiago
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
The second concession for Route 57 Santiago-Colina-Los Andes
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
The second concession for Route 5 between Collipulli and Temuco
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Route 5 between Iquique and Antofagasta
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Talcahuano Cable Car
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Valparaíso - Santiago Railway Concession
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Route G21 Second concession - Road to Farellones
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Second Santiago Justice Center concession
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Second O'Higgins Park covered stadium concession
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Second Route 5 concession, Río Bueno – Puerto Montt section
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Route 5 Chacao-Chonchi Concession
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Pie de Monte Route Concession
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Coquimbo Desalination Plant
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
New Penitentiary Facility in Copiapó
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
2nd Concession Penitentiary Infrastructure Group 1 (Alto Hospicio – La Serena)
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
Second Concession for the Rancagua Penitentiary Facility
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.
2nd Concession Penitentiary Infrastructure Group 3 (Valdivia and Puerto Montt)
Conoce los detalles del proyecto, sus principales obras y cronograma. Infórmate sobre las condiciones económicas y las medidas de tratamiento ambiental.